Trimble
PDF Export RSS - Latest News


Alignment Reports

This function prepares a data entry file for user reference for the selected Track/objects. The following reports can be generated.

  • Comma-separated Report (.CSV)
  • Comma-separated reports can be easily imported to spread sheets.
  • Horizontal and Vertical displacement report (.ALC)
  • Horizontal and Vertical displacement report (.VER)
  • (.GEO)
  • (.KOF)

Run the tool from the following locations.

MOUS_ICO Menu: Railway > Reports > Alignment Reports
MOUS_ICO Toolbar: Reports > Alignment Reports
MOUS_ICO Ribbon: Railway > Reports Alignment Reports Alignment Reports

The dialog box 'Alignment Reports' will pop up.

Define the following parameters:

  • Track Name: User reference for identifying the track.
  • Section Description: User reference for identifying the section.
  • Report Number: User reference for tracking the reports.
  • From/To Station: Define section for which report is to be generated.
  • Mark the check box of the desired report to be generated.

Note: It is recommended generate one report at a time instead of generating all the reports simultaneously.

When OK is selected, a dialog box will be displayed from which user may select the file name for the report.

Note: It is recommended that user select a file name with the extension following extensions, which makes easier to locate files.

Comma-separated report

<File name>.CSV

Horizontal and vertical displacement report

<File name>.ALC

Horizontal and vertical displacement report

<File name>.VER

GEO Plasser

<File name>.GEO

Stakeout data

<File name>.KOF After defining the file name and location of the file, follow the command prompt.

Lifting Scheme CSV

Lifting Scheme CSV (Comma Separated Report Format)

This report can be generated from the function 'Alignment Reports'. This report consists of the following elements:

  • Fixed points
  • VUL data
  • Horizontal data
  • Vertical data
  • Speed data

Comma-separated report (CSV) file can be imported to spreadsheets.

Note: The VUL data will not be generated.

When OK is selected, a dialog box will be displayed from which you may select the filename for the lifting schedule data:

It is recommended that you select a filename with the extension .CSV, to make it easier to locate files. When a filename is selected or entered the following message will be displayed in the command field:

Pick track:

Select the track for which Comma-separated report is to be generated.

It is important that the selected line is set to active in the Novapoint project. If not, the program will not find the vertical alignment design. If data is missing on this line you will see a relevant message and the data will not be included in the lifting schedule.

en/np/rail/menu/reports/alignment_reports.txt · Last modified: 2014/02/13 10:52 by vn_no_rbr